Varso Tower, Warszawa

  1. References
  2. Varso Tower, Warszawa
Varso 03 panorama
Yet another exciting project has been built using fastenings developed and produced by Invisible Connections AS in Åndalsnes. Before the summer of 2019, it became clear that solutions from Invisible Connections AS were to be used in the 310 meter high Varso Tower in Warsawa. The tower was opened in 2020 and the stairs are all installed in the 54-storey building.

IC product: Stair connector special

Year of cnstruction: 2019/20

Architect: Foster og Partners

Contractor: HB Reavis

Another exciting project has been built using fasteners that have been developed and produced at Invisible Connections AS in Åndalsnes. Before the summer of 2019, it became clear that solutions from Invisible Connections AS were to be used in the 310 meter high Varso Tower in Warsaw. The tower was opened in 2020 and the stairs are all installed in the 54-storey building.

8720 chmielna business center
Varso top
Varso inside
Picture1
Varso 03 panorama
32349585702 27d436d947 o
Varso rooftop terrace