Norsk
English
Norsk
English
Products
Stair-landing connections
Balcony connections
Beam-column connections
Double-Tee connections
Welded connections
Other production services
Instructions
Instructions for stair connections
Instructions cantilevered balconies
Instructions for balconies with shear connections - BWC
Instructions for beam-column connections
Instructions for Double-Tee connections
Movies
Resources
Stair-landing Connections
Baconies with cantilevered connection
Balconies with shear connection - BWC 55-740
Balconies with shear connections - BWC light
Beam-column connections
Double-Tee connections
Welding detalis
References
Sustanability
Brochures
About us
About us
Newsletter
Contact
CE marked and tested solution
Event
Products
Stair-landing connections
Balcony connections
Beam-column connections
Double-Tee connections
Welded connections
Other production services
Instructions
Instructions for stair connections
Instructions cantilevered balconies
Instructions for balconies with shear connections - BWC
Instructions for beam-column connections
Instructions for Double-Tee connections
Movies
Resources
Stair-landing Connections
Baconies with cantilevered connection
Balconies with shear connection - BWC 55-740
Balconies with shear connections - BWC light
Beam-column connections
Double-Tee connections
Welding detalis
References
Sustanability
Brochures
About us
About us
Newsletter
Contact
CE marked and tested solution
Event
References
Alle
Stair-landing connections
Balcony connections
Beam-column connections
Double-Tee connections
Park+, Haugesund
At Park+ we have supplied connections for balconies: BWC 40 U-H and BWC cantilevers as well as connections for stairs: TSS 102 and TSS 25 L
Tetriz, Bergen
On this project in Bergen, we delivered the BWC 55-740 with angles. Fire protected R60. Erstad & Lekven Utbygging has built a residential building on a plot with a good view in Indre Arna, Tetriz consists of 24 large apartments of a high standard.
Blomkvartalet, Heimdal
In the Blomkvartalet project, we have delivered BWC WB embedded in precast sandwich walls and arrangements of precast concrete balconies at angles. The Blomkvartalet is named after Jan Ditlev Blom, who erected the very first residential and commercial building at Heimdal south of Trondheim in 1859. The concrete facades are pigmented with three shades of terracotta colours.
D13 Haukeland Holdeplass
In this exciting project, we have delivered connections for stairs and IC boxes for wall recesses. D13 Haukeland Holdeplass is an underground light rail stop at Haukeland hospital with a challenging and special stair geometry.
Vågsbygd Sentrumsbygg
The housing project Vågsbygd Sentrum is, as the name suggests, located in the center of Vågsbygd, just behind Amfi Vågsbygd with its approx. 45 stores. For HOUSES 1 and 2, we supplied everything from balcony connections and a number of special consoles for connecting solid wood constructions.
Nordviken, Hamar
Nordviken Øvre constituted the last phase in the development of Nordviken, which has given 230 buyers a new and modern home, and Hamar a new and vibrant district. Here we delivered BWC 55 Light-1 embedded in the slabs. Concrete balconies rest on an angle.
Sandakerveien 56
The west block on Torshovhøyden consists of 28 gorgeous 3- and 4-room freehold apartments from 58.5 to 97.5 square meters adapted to most needs. The western block is airy and several apartments have spectacular views! IC's contribution is BWC 40 U-H to the cantilevered concrete balconies with a skirt solution.
Town House, Kingston University
For this award-winning project, beam-colum connections were chosen to achieve architecturally fine connections between beams and columns. The building is part of Kingston University and houses a library, dance studio, reading rooms and cafe.
Royal Mint Gardens, London E1
Superstructure in the airspace above the Docklands Light Railway (DLR), Royal Mint Gardens consists of 3 residential towers of 15, 14 and 13 storeys. The roof above the line consists of prefab beams, BSF was chosen to attach these.
Forus Parkering Vest
Project manager Alf Rune Stokka in Lothe Bygg told Byggindustrien that there is room for 1,249 cars on the building's seven floors with parking. There are 435 columns and girders, 810 DT elements and 194 hollow cores in the building.
YTL BB Tower, Kuala Lumpur
TSS 41 was chosen for the installation of prefab stairs in YTL's BB Tower in KL, a total of 25,800 square meters spread over 32 floors. Our partner in Malaysia, Leviat was responsible for the sale and delivery of the TSS 41.
Fredsvännen, Falkenberg Sverige
Skanska chose to use TSS 102 to attach the landing/rest floor at Fredsvännen, Falkenberg. Using TSS 102 to attach stairs ensured fast and efficient assembly, as well as meeting sound requirements. Skanska was very satisfied with IC TSS 102.
P-Hus Bertel O Steen, Stavanger
Car park built adjacent to sales premises and workshops at Bertel O. Steen in Stavanger. Used DTS, BSF and TSS to connect concrete elements.
79 & Park Stettin, Stockholm
Invisible Connection's stair solutions were used on this great apartment project in Stockholm. The project with a gross area of 18,600 square meters and consists of 168 apartments. The client and main contractor is Oscar Properties Bygg. In order to satisfy the sound requirements and have a quick and efficient installation of the stairs, the TSS102 was chosen. The element producer is Lasbet AS in Estonia and the IC products were supplied by our distributor Semtu As
Pir Cowork
Invisible Connections is proud to deliver to the new landmark at Ålesund harbour. The stairs are more like a work of art and of course with TSS102.
Malmö hospital
Skanska chose to use TSS101 for fixing stairs in the new Malmö hospital, they then achieve an efficient, fast and safe installation of stairs. Element producer is Lithana Group in Lithuania and TSS was delivered by our distributor Semtu.
Noblessner Home Port, Tallinn
TSS 102 was chosen for fixing stairs at the new building complex at the seafront in Tallinn.
Drivbänken, Malmö
The TSS60P and associated IC Box SRU with sound reduction were chosen for connecting prefabricated stairs in the Drivbänken building complex.
New Narvik hospital
In the autumn of 2024, Narvik can boast a brand new hospital with Norway's largest complete building including concrete elements. IC's contribution is TSS 101 and TSS 25 L for fixing concrete stairs.
Basecamp Narvik
New hotel at the ski slopes in Narvikfjellet with retrofitted cantilevered balconies suspended from BWC 40 U-H.
Kræmer Brygge, Tromsø Bygg Alfon B og C
Kræmer Brygge will be a new chapter in the city's history. Here BWC 40 U-H with BWC Cantilever IPE prepared for either wooden balconies facing the sea/corner balconies or thin concrete slabs was used.
Teinevikjo, Stord
37 state-of-the-art apartments close to the center on the quayside and 28 sea stalls on the seafront in the center of Leirvik. Here we delivered BWC WB embedded in sandwich walls and BWC 55-4 in concrete balconies.
Dovrekvartalet K-tre, Lillestrøm
New building of apartments in Lillestrøm with 86 apartments, distributed over three buildings. For this project, we have delivered our TSS 25 L stair connection, which connects prefabricated stairflights to landings. TSS 25 L is a cost-saving "all in one" connection, which replaces traditional shelf solutions. The product is fully reinforced, has stepless height adjustment and is used for crane/assembly. Prefabricated landings are fitted with our TSS 102 sound reducing unit.
Storebukta Oppegård
Balcony connections for retrofitted cantilevered balconies BWC 40-U-H Storebukta consists of 67 apartments spread over two buildings with an underlying basement and 13 townhouses. The project is centrally located in the center of Kolbotn in Oppegård municipality.
Årvoll Omsorgssenter, Alnabru
80 well-adapted apartments with balconies have been moved into Årvoll care centre. Here, the elderly in the district of Bjerke in Oslo can live and live in pleasant surroundings with access to a good view, community and care in a new and modern building.
Varso Tower, Warszawa
Yet another exciting project has been built using fastenings developed and produced by Invisible Connections AS in Åndalsnes. Before the summer of 2019, it became clear that solutions from Invisible Connections AS were to be used in the 310 meter high Varso Tower in Warsawa. The tower was opened in 2020 and the stairs are all installed in the 54-storey building.
Ramstadtunet, Nannestad
Invisible Connections®'s contribution was the delivery of a fastening solution which, in combination with a free cantilever, could be retrofitted after the climate wall. The balcony itself was retrofitted after the facade was established.
Egersund Næringspark, Langholmen
Egersund Næringspark Langholmen is a main network port, close to the highway and a short distance to the railway and the city centre. The area consists of over 40 acres of commercial land, is regulated for industry, storage and port operations, is planned to maintain high quality and with well-functioning infrastructure.
Øvre Utstillingsplass, Ålesund
Just east of the city center of Ålesund, the Øvre Utstillingsplass residential project near the city center stands with 33 new freehold apartments, connected to Bybadet in Ålesund, which was built in connection with the project. IC product: BWC 55 light w/ angle for balconies. TSS 102 for internal stairs
Grua Torg, Lunner Kommune
In the center of Grua, Backe Oppland recently completed 36 apartments with underground parking. Here BWC 55 light was used for retrofitted balconies with columns in front.
Google headquarter, London
Invisible connection will deliver stair connection TSS 101 to Google's new Headquartersin King’s Cross, London. Nicknamed the ‘landscraper,’ the flagship office building is 72 metres tall at its highest point and stretches to 330m - making it longer than the 310m Shard skyscraper is tall. The £1 billion purpose-built 11-storey structure comprises over 1 million sq ft. Amenities include a gym, pool, multi-use games area, plus landscaped terraces, and a walking 'Trim Track' at roof level. All materials are sourced through Google’s healthy materials program.
Southbank Place, London
More than 1,700 TSS and RVK stair connections were delivered for this project. This is Shell's old HQ which has now become apartments and offices, with one of London's finest locations on the South Bank, with a view to, among other things, the London Eye
Fyritunet, Hemsedal
Ski in/out apartments at Fyri Tunet in Hemsedal. Built close to Fyri Resort. Here we delivered BWC 40 U-H with outriggers in HUP for thin, freely cantilevered concrete balconies.
Solberget , Nesttun
At Nesttun, Block Watne has built five buildings with a total of 95 apartments that surround a large and beautiful outdoor area. Here, IC has supplied BWC WB/BWC 55-740 with BWC 55-4 or TSS 102 G for balconies with columns in front.